N E W S
USE evaluates Hungary’s capability to produce wind energy 
The Power Systems Unit (USE) has recently finished the first stage of the study that was carried out in order to evaluate the capability that the Hungarian electrical system has of producing wind energy. The unit has already presented the preliminary report to the Hungarian Energy Office.
Meanwhile, the study requested by Gamesa Energia Portugal in order to evaluate Portugal’s connection to the grid at the Monte do Tolo’s wind farm has already started.
|