B u l l e t i n Number 60, March 2006 - Year VI

 BIP em Português BIP em Português 

Home Highlight Editorial Special Report Archive
   

N E W S

Power Systems Unit concludes study on photo-voltaic pannels for AENOR Group

The Power Systems Unit concluded a technical-economical feasibility study of the installation and connection to the public electricity network of photo-voltaic solar panels, in slopes and areas with an adequate solar orientation, in highways allotted to companies of the AENOR Group.

The work was carried out by a team coordinated by Cláudio Monteiro.



<< Previous | Next >>

 

 

 

 

 

 

INESC Porto © 2006            |About Us      |Top      

DISCLAIMER: BIP is a non official and irreverent communication medium and the articles and
opinions published do not reflect the official position of the institution and are of the sole responsibility of their authors.